Electric Boat Seaplane Ramp Demolition

Project

Electric Boat Seaplane Ramp Demolition

MARKETS

Marine
Demolition

CONTRACT TYPE

Prime Contractor

PROJECT OWNER

Quonset Development Corp

LOCATION

North Kingstown, RI



Printable PDF

Quonset Development Corporation contracted Manafort Transit to demolish an existing seaplane ramp in North Kingston, RI. The work consisted of installation and maintenance of a turbidity barrier around the site, demolishing the 200 ft. long by 50 ft. wide reinforced concrete ramp which included the extraction of approximately 224 creosoted timber piles, 56 concrete pile caps, concrete beam between pile caps, and the concrete deck structure.

Access to the site from land to the water was not provided by the owner due to site restrictions. As a result, all materials, equipment, and debris had to be transported to and from the site via barges and tugboats. 

Manafort served as the Prime Contractor for the project and self-performed all the work. 